FAQs

What does Optima Charge specialize in?

Optima Charge LLC designs, builds, and operates ultra-fast charging infrastructure for medium- and heavy-duty electric trucks. Our systems integrate advanced DC Fast and Megawatt Charging (MCS) technologies, ensuring dependable, future-ready charging for fleets, drayage, and logistics operators.

How does Optima Charge support property owners and investors?

We offer flexible partnership models for landowners, investors, and fleet operators — from zero-cost site hosting to full co-ownership structures. Optima Charge handles every stage — from design, permitting, and utility coordination to construction, operation, and long-term maintenance.

What makes Optima Charge stations unique?

Each site is engineered for scalability, efficiency, and uptime. Our charging hubs feature smart-grid integration, renewable-energy pairing, and optimized layouts to support Class 8 trucks and commercial EV fleets with minimal installation time and maximum performance.

How does Optima Charge integrate advanced technology?

We combine proprietary Optima Charge power systems with intelligent load-management software, ensuring high efficiency, grid stability, and full compatibility with upcoming MCS and next-generation charging standards.

How can I partner with Optima Charge?

Whether you’re a property owner, fleet operator, or investor, Optima Charge offers structured programs that share revenue or equity. Contact our team to evaluate your site, explore co-investment opportunities, and select the best model for your business goals.

How much can I earn from a charging partnership?

Revenue potential depends on site traffic, energy rates, and utilization. We provide detailed financial models showing expected returns based on your site’s power capacity and fleet demand.

What determines ROI?

Key factors include EV traffic volume, utilization rates, installation cost, and your selected partnership structure.

How long until I break even?

Typical breakeven periods range from 3 to 6 years, depending on location demand, utility pricing, and incentive participation.

What’s included in a site assessment?

Our assessment covers power availability, site layout optimization, ADA compliance, energy demand forecasts, and revenue projections.

Do you perform physical site visits?

Yes. Every qualified site includes an on-site walkthrough by our engineering and permitting team.

Do you supply stamped, permit-ready plans?

Absolutely. Our licensed engineers deliver PE-stamped electrical, structural, and civil drawings ready for city submission.

Is my site zoned for EV charging?

Most commercial and industrial parcels qualify by right. Our permitting specialists confirm zoning and handle all local approvals.

How long does permitting take?

Generally 4 – 8 weeks, depending on jurisdiction and utility coordination timelines.

Who installs the chargers?

Optima Charge manages certified, insured electrical contractors and oversees all installation activities to meet UL and utility standards.

How long does construction take?

Average 3 – 6 weeks after permits and utility service are finalized.

What if a charger goes offline?

We provide 24/7 monitoring and remote diagnostics. Field crews are dispatched immediately for any required on-site maintenance.

How often are chargers serviced?

Routine inspections occur quarterly, supplemented by continuous remote monitoring and performance tracking.

Does Optima Charge offer long-term support?

Yes — we provide lifetime maintenance, uptime management, and performance reporting for every site under our network.

Join Our Mailing List

Get project updates, exclusive partnership opportunities, and clean-energy insights delivered directly to your inbox.

Learn more